NMCC Building Constructions

NMCC Building Constructions

A fully finished cabin, studio, and storage building built by The Building Construction Technology Class of  2024 at Northern Maine Community College. More pictures will be taken as construction progresses.

Northern Maine Community College, 33 Edgemont Dr., Presque Isle, Maine 04769
Ended on
All Categories
Closed
Sort By
12’x36’ Cabin (includes 6’ porch)
Lot 1: 12’x36’ Cabin (includes 6’ porch)

Open kitchen/living area, 8’x12’ bedroom, 5’x8’ bathroom with shower, vanity, toilet; electrical wiring, lights, outlets and panel; insulated walls and ceiling; interior finished with T&G pine; 5 windows and 1 pass door; vinyl siding, asphalt roof shingles. More pictures will be taken as construction progresses. Final completion date for all constructions is May 3, 2024.

Ends:
Completed
$40,500.00
Bids:139
Bidding complete
View Lot Details Now
12’x24’ Studio
Lot 2: 12’x24’ Studio

Open interior with insulated walls and ceiling; T&G pine finish; electrical wiring, lights, outlets and panel; 4 windows and 1 pass door; vinyl siding, asphalt roof shingles. More pictures will be taken as construction progresses. Final completion date for all constructions is May 3, 2024.

Ends:
Completed
$13,750.00
Bids:91
Bidding complete
View Lot Details Now
12’x20’ Storage Building
Lot 3: 12’x20’ Storage Building

Unfinished, open interior; no insulation or electrical; 3 windows, 1 pass door, 1 double door; wood siding, asphalt roof shingles. More pictures will be taken as construction progresses. Final completion date for all constructions is May 3, 2024.

Ends:
Completed
$9,500.00
Bids:67
Bidding complete
View Lot Details Now